Page #5

INSTALLATION MANUAL

STEP 2: PAGE 3 OF 4

BOTTOM TRACK INSTALLATION

DIAGRAM 2.4
step2-3o4.gif (10681 bytes)

DIAGRAM 2.4

A polyurethane sealant should be used to seal bottom tracks to concrete (concrete is too porpous to use silicone)

DIAGRAM 2.5
step2-3o44.gif (10122 bytes)

DIAGRAM 2.5

Apply a large bead of sealant into the sealant reservoir of the bottom tracks (on under side).

 

[ Home ] [ Page #2 ] [ Page #3 ] [ Page #4 ] [ Page #5 ] [ Page #6 ] [ Page #7 ] [ Page #8 ] [ Page #9 ] [ Page #10 ] [ Page #11 ] [ Page #12 ] [ Page #13 ] [ Page #14 ] [ Page #15 ] [ Page #16 ] [ Page #17 ] [ Page #18 ] [ Page #19 ] [ Page #20 ] [ Page #21 ] [ Page #22 ] [ Page #23 ] [ Page #24 ] [ Page #25 ] [ Page #26 ] [ Page #27 ] [ Page #28 ] [ Page #29 ] [ Page #30 ] [ Page #31 ] [ Page #32 ] [ Page #33 ]