Page #5

INSTALLATION MANUAL

STEP 2: PAGE 3 OF 4

BOTTOM TRACK INSTALLATION

DIAGRAM 2.4
step2-3o4.gif (10681 bytes)

DIAGRAM 2.4

A polyurethane sealant should be used to seal bottom tracks to concrete (concrete is too porpous to use silicone)

DIAGRAM 2.5
step2-3o44.gif (10122 bytes)

DIAGRAM 2.5

Apply a large bead of sealant into the sealant reservoir of the bottom tracks (on under side).

 

Home ] Page #2 ] Page #3 ] Page #4 ] [ Page #5 ] Page #6 ] Page #7 ] Page #8 ] Page #9 ] Page #10 ] Page #11 ] Page #12 ] Page #13 ] Page #14 ] Page #15 ] Page #16 ] Page #17 ] Page #18 ] Page #19 ] Page #20 ] Page #21 ] Page #22 ] Page #23 ] Page #24 ] Page #25 ] Page #26 ] Page #27 ] Page #28 ] Page #29 ] Page #30 ] Page #31 ] Page #32 ] Page #33 ]