Page #30
|
INSTALLATION MANUAL
|
STEP 11: PAGE 1 OF 4
|
INSTALLATION INSTRUCTIONS FOR THE NEW VINYL SLIDING GLASS DOOR
PARTS:
STEP I
MEASURE OPENING:
THE OPENING SHOULD BE 1/8" LARGER THAN THE NEW VINYL DOORFRAME. SEE ILLUSTRATION
ABOVE FOR ROUGH OPENING SIZES. PLUMB AND SECURE THE MULLIONS ON EITHER SIDE OF THE OPENING
TO THE ROUGH OPENING WIDTH.
LEVELING FOUNDATION
PLACE BOTTOM TRACK (SUPPLIED WITH ROOM ORDER) UPSIDE DOWN INTO THE BOTTOM
TRACK FASTENED TO THE FOUNDATION. LEVEL OFF TO INSURE DOORFRAME WILL BE LEVEL AND SQUARE.
FASTEN REVERSE BOTTOM TRACK AT TWO OR THREE POINTS TO THE EXISTING BOTTOM TRACK (SEE
ILLUSTRATION) USING EITHER #8 TEK SCREW OR POP RIVET.
|