STEP 2
FRAME INSTALLATION:
THE NEW VINYL FRAME HAS WEEP HOLES PUNCHED ON THE TOP AND BOTTOM. THIS WILL ALLOW THE
DOOR TO OPEN AND CLOSE FROM WHICH EVER SIDE IS NECESSARY. AFTER DETERMINING THE DIRECTION
THE DOOR WILL BE OPENING PLACE INTO THE OPENING WITH NAIL FIN TO THE OUTSIDE OF THE ROOM
(SEE ILLUSTRATION)
FASTENING:
BEFORE FASTENING THE DOOR TO THE ROOM, CHECK THE SQUARE OF THE FRAME (MEASURE
DIAGONALLY). MAKE ANY ADJUSTMENTS THAT WOULD BE NECESSARY TO MATCH UP THE TWO DIAGONAL
MEASUREMENTS. PREDRILL 3/8' PILOT HOLES THROUGH THE FIRST LAYER OF THE DOOR (SEE
ILLUSTRATION) AND FASTEN DOORFRAME TO MULLIONS ON ALL FOUR SIDES NTH #8 X 1" TEK
SCREWS. THERE ARE ENOUGH SCREWS SUPPLIED TO FASTEN FOUR SCREWS TO EACH SIDE OF THE
DOORFRAME. AFTER SECURING THE FRAME PLUG 3/8' HOLES WITH THE PLASTIC PLUGS SUPPLIED. |