Page #4

INSTALLATION MANUAL

STEP : PAGE 2 OF 4

BOTTOM TRACK INSTALLATION

DIAGRAM 2.2
step2-2o4.gif (3577 bytes)

DIAGRAM 2.2

The SIDE WALL BOTTOM TRACK will always be short of the FRONT WALL BOTTOM TRACK. Place the FRONT WALL BOTTOM TRACK in front of the SIDE WALL BOTTOM TRACKS (weep holes to out side) and make a 90 degree angle at each corner. This will give you the correct width and projection of the room..

DIAGRAM 2.3
step2-2o44.gif (6394 bytes)

DIAGRAM 2.3

Take a diagonal measurement from corner to corner, both measurements are the same. Line A must equal line B, & line C must equal to line D to assure corner is square. When this is done, the bottom tracks are ready to be secured to the foundation. Check to make sure weep holes are facing out. Begin drilling through your pre drilled holes starting at the end of the bottom track. Place a screw or drill bit in these holes as needed to prevent shifting of bottom track out of square while drilling remaining holes (if foundation is wood use lag screws). After drilling is complete, remove & clean bottom track & foundation thoroughly.

 

Home ] Page #2 ] Page #3 ] [ Page #4 ] Page #5 ] Page #6 ] Page #7 ] Page #8 ] Page #9 ] Page #10 ] Page #11 ] Page #12 ] Page #13 ] Page #14 ] Page #15 ] Page #16 ] Page #17 ] Page #18 ] Page #19 ] Page #20 ] Page #21 ] Page #22 ] Page #23 ] Page #24 ] Page #25 ] Page #26 ] Page #27 ] Page #28 ] Page #29 ] Page #30 ] Page #31 ] Page #32 ] Page #33 ]