Page #10
|
INSTALLATION MANUAL
|
STEP 4: PAGE 1 OF 6
|
CLASSIC CURVED ROOF SUNROOM: BEAM ROOF INSTALLATION
MATERIAL NEEDED
DIAGRAM 4.1
DIAGRAM 4.1
The Curved Eave Header & Attachment Channels have pre-punched holes for the proper
placement of the Rafters 4.1 A & B. The Rafters should be the exact lengths needed for
the projection of the Sunroom. The rafters may be trimmed if the back wall is uneven.
Rafters should be placed on the Curved eave header, aligned with the pre-punched
holes & inserted into the Attachment Channel at the corresponding pre-punched holes.
Attach the Rafter to the Header Beam with #14 x 1" Tek Screws, plumb the front
wall & secure to the Attachment Channel. Repeat this until all Rafters are in
Place.
|